Heavy duty bridges Pemba - Mozambique
Delivery and installation of a 48 meter and a 44 meter long Heavy Duty Panel Bridge as a linkspan from shore to a pontoon.
The facility is needed to create a temporary harbour facility for loading and offloading supplier vessels. Supply included launching equipment and tools, supervision on (pre)assembly and launching and engineering works.
Project details
Solution
Truss bridge
Type
JTB
Client
Bollore Africa Logistics, ENH Logistics S.A.
Number of Bridges
2
Bridge Length
48 meter, 44 meter
Bridge width
6 meter
Completed
2013, 2019
-
After finding large quantities of gas off the coast of Cabo Delgado large oil and gas companies have invested in building up the infrastructure to extract, liquefy and export the gas.
-
Janson Bridging's RoRo solution was part of the marine infrastructure increasing the port capacity of Pemba.
Highlighted
Projects
Here we proudly present a number of the many projects that we as Janson Bridging were able to realize worldwide.
Solution
RoRos
The Janson Bridging roll-on-roll-off (RoRo) system makes loading and unloading from ships much easier in harbours with tidal movement. Janson’s RoRo s...
Solution
Engineering
Established in 1972 in the Netherlands, Janson Bridging is respected in the market for its innovative products and services. We have executed over 7.0...